The Michigan high rise in 2019, the added elevator shaft reading in the same red and tan brick as the tower

Matching New Brick on a Michigan Elevator Shaft Addition

Two stories were added to the elevator shaft on this building and the brick that went up did not match the brick already there. The mason who hired the work had the new brick stained to meet the old. It was photographed again twenty-one years later and certified then.

Case No. 215
Structure Elevator shaft on a high rise
Location Michigan
Stained 1998
Re-photographed 2019
Elapsed 21 years, Platinum level

1998

  1. The new elevator shaft in 1998, a flat pale buff brick plane standing against the tower's mottled red brown wall, with a boom lift at the right Before, 1998 View this photo larger
  2. The tower from the car park in 1998, two workers on a lift platform high on the wall and construction fencing across the base During, 1998 View this photo larger

What was wrong

Two stories went onto the elevator shaft. The brick laid on the addition did not match the brick already on the building, so the shaft stood as a flat pale block against a mottled red wall. The file states the issue in eight words: the customer was looking for a better match.

The form marks it hired by the mason or contractor. The storyline names the building owner as the one who added the two stories.

What was done

Mineral stain, brushed on by hand, on the units that were off. Not one color over the whole shaft: the file records the correction as staining the off colored brick, which is why the finished face still reads as several brick colors rather than one.

2019, twenty-one years on

  1. The high rise in 2019 with the elevator shaft standing clear against the sky, both walls in the same range of red and tan brick 2019 View this photo larger
  2. The stained elevator shaft in 2019 beside the tower wall, its face carrying the same mixed reds, tans and dark units as the wall next to it 21 Years After View this photo larger
  3. Brick at close range in 2019 at the foot of the tower, an even mix of orange reds and dark browns running the length of the wall 2019 View this photo larger

What twenty-one years prove

Same shaft, same tower. In 1998 the addition was a flat buff plane beside a mottled red wall; in 2019 its face carries the same mixed reds, tans and dark units as the wall next to it. On the certification scale that is Platinum, which covers twenty years and over and is the top of the scale. As of 2026 the work is twenty-eight years old, and the 2019 certification is the most recent record on it.

The signed file

Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 215, transcribed beside the scan so it can be read on a phone and by a search engine.

Scan of the case study form for case 215, filled in and signed View the signed form full size
Project name
Elevator Shaft (1998)
Level
Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
Hired by
The mason or contractor
Reason for project
Addition or makeover
Issue
"The customer was looking for a better match."
What was corrected
"We stained the off-colored brick."
Storyline
"The building owner added two stories to the elevator shaft but the brick installed did not match the existing brick so they hired us to fix it. The staining still looks great today!"
Authorized
Donald A. Foster, signed, dated 2019

Your Project, Documented for Decades

Every job we stain enters the same discipline: photographed, revisited, re-photographed.

Request a Quote
Call Us Request a Quote