Matching Five Runs of Brick to a Notre Dame Addition
A three-story addition went onto a power plant whose original walls were built from five different runs of brick. Rather than accept a mismatch, the five runs and the mortar were stained to meet the new construction. It was photographed again eleven years later.
2008, before and during
What was wrong
The original power plant was not built from one brick. The file records five different runs in the existing walls, and a new three-story addition was going up against them. Matching a new building to an old one is hard enough when the old one is a single color; here it was five, and some of the runs did not share a texture.
What was done
The five runs and the mortar were stained to meet the new construction, brick by brick. The file's own summary: color enhanced the existing brick to match the new brick, and it calls the job challenging for exactly the reason above, some of the brick having different textures. Because the stain is absorbed rather than laid on top, the texture of each run survives the match instead of disappearing under a film.
The work was proved before it was finished. A reverse test panel was stained into the wall, an L shape through the brick and the mortar, so the university could see the blend against the untouched brick beside it and approve it before the rest went ahead.
2019, eleven years on
-
11 Years After
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
What eleven years prove
Same plant, same viewpoint, and five runs of brick still reading as one wall. On the certification scale that is Silver, which covers ten years and over. The last photographs were taken in 2019 and the file was signed in 2020.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 059, transcribed so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- University of Notre Dame Power Plant (2008)
- Level
- Silver. The scale runs Bronze at seven years and over, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The school or university
- Cause
- Color change
- Background
- "The university's original power plant was made up of five different runs of brick."
- Actions taken
- "Stained the mortar and five different runs of brick to match the new three story addition."
- Detail of events
- "Color enhanced the existing brick to match the new brick. This was a challenging project, especially with some of the brick having different textures."
- Authorized
- Donald A. Foster, signed, dated 2020