The long brick elevation of the Notre Dame power plant in 2019, its stack and water tower behind

Matching Five Runs of Brick to a Notre Dame Addition

A three-story addition went onto a power plant whose original walls were built from five different runs of brick. Rather than accept a mismatch, the five runs and the mortar were stained to meet the new construction. It was photographed again eleven years later.

Case No. 059
Structure University power plant
Location South Bend, Indiana
Stained 2008
Re-photographed 2019
Elapsed 11 years, Silver level

2008, before and during

  1. The power plant elevation in 2008, its brickwork running in bands of noticeably different colors, with the stack and water tower behind Before, 2008 View this photo larger
  2. An outside corner in 2008 with the two walls meeting at visibly different brick colors, one face warmer than the other During, 2008 View this photo larger

What was wrong

The original power plant was not built from one brick. The file records five different runs in the existing walls, and a new three-story addition was going up against them. Matching a new building to an old one is hard enough when the old one is a single color; here it was five, and some of the runs did not share a texture.

What was done

The five runs and the mortar were stained to meet the new construction, brick by brick. The file's own summary: color enhanced the existing brick to match the new brick, and it calls the job challenging for exactly the reason above, some of the brick having different textures. Because the stain is absorbed rather than laid on top, the texture of each run survives the match instead of disappearing under a film.

The work was proved before it was finished. A reverse test panel was stained into the wall, an L shape through the brick and the mortar, so the university could see the blend against the untouched brick beside it and approve it before the rest went ahead.

2019, eleven years on

  1. The same elevation in 2019 from the same viewpoint, the brickwork now reading as one continuous wall 11 Years After View this photo larger
  2. The plant from the road in 2019, the addition and the original walls carrying the same brick color across the whole frontage 2019 View this photo larger
  3. A stained wall in 2019 in raking light, the courses reading as one blend across a downpipe and a window reveal 2019 View this photo larger
  4. Brick at close range, two runs of different texture meeting at a mortar joint and carrying the same color 2019 View this photo larger

What eleven years prove

Same plant, same viewpoint, and five runs of brick still reading as one wall. On the certification scale that is Silver, which covers ten years and over. The last photographs were taken in 2019 and the file was signed in 2020.

The signed file

Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 059, transcribed so it can be read on a phone and by a search engine.

The case study form for case 059, filled in and signed View the signed form full size
Project name
University of Notre Dame Power Plant (2008)
Level
Silver. The scale runs Bronze at seven years and over, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
Hired by
The school or university
Cause
Color change
Background
"The university's original power plant was made up of five different runs of brick."
Actions taken
"Stained the mortar and five different runs of brick to match the new three story addition."
Detail of events
"Color enhanced the existing brick to match the new brick. This was a challenging project, especially with some of the brick having different textures."
Authorized
Donald A. Foster, signed, dated 2020

Your Project, Documented for Decades

Every job we stain enters the same discipline: photographed, revisited, re-photographed.