Spot Staining Chips and Body on a Maumee White Brick Home
The white brick on this house was a very hard unit with low absorption, and chips and body showed through its texture. The company that made the brick hired a half day of staining on the most obvious spots. It was photographed again sixteen years later and certified then.
2003
What was wrong
The file records chips and body showing through due to the texture of the brick. A white face on a hard, dense unit: wherever the surface was chipped, the darker body underneath showed. The company that made the brick hired the correction, not the homeowner.
What was done
Mineral stain, brushed on by hand, for half a day, on the most obvious spots. The file is candid about the unit: a very hard brick with low absorption, but enough. Absorption decides whether stain can take at all, and on this brick there was enough.
2019, sixteen years on
-
2019
View this photo larger
-
After, 2019
View this photo larger
-
2019
View this photo larger
-
16 Years After
View this photo larger
What sixteen years prove
Same entry, same white brick, and the spots that were stained in 2003 do not read as spots. On the certification scale that is Gold, which covers fifteen years and over. As of 2026 the work is twenty-three years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 322, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Maumee, OH Project (2003)
- Level
- Gold. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- No box is marked on the form.
- Issue
- "There were chips and body showing through due to the texture of the brick."
- What was corrected
- "We were hired for a half day to stain the most obvious spots."
- Storyline
- "The brick used on this project was a very hard brick with low absorption but enough for us to still be successful. The project still looks great today!"
- Authorized
- Donald A. Foster, signed, dated 2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


