A window band on the college in 2019, the brick around it holding one even red range

Darkening Pale Entrance Brick at Macomb Community College

The 8 by 8 brick at the entrance of this community college went up too light. The company that made the brick paid to have the color corrected rather than torn off. It was photographed again twenty-one years later and certified then.

Case No. 218
Structure Community college
Location Michigan
Stained 1998
Re-photographed 2019
Elapsed 21 years, Platinum level

1998

  1. An applicator working by hand along a course of upright brick on a large red brick wall, standing at a low parapet During, 1998 View this photo larger
  2. A tall brick wall above a sloped coping in low sun, two courses of upright brick running across it and the field reading as one warm range After, 1998 View this photo larger

What was wrong

The brick arrived too pale. Nothing had failed and nothing was dirty; the 8 by 8 units at the entrance did not read as the color they were meant to be. The file states the issue in one line: the color of their 8 by 8 brick were too light.

It was hired by the brick manufacturer, not the college and not the mason. A brick company decided the color of a finished building it had supplied was its own problem, and paid for staining over tear-out.

What was done

Mineral stain, brushed on by hand, unit by unit across the entrance. The correction field reads: we darkened the brick to the desired shade. The storyline field on the same sheet says lightened. Both are transcribed below word for word, beside the scan.

2019, twenty-one years on

  1. The college wall from below in 2019, a curving roofline over three tall windows and the brick reading as one even red range from the sills to the parapet 21 Years After View this photo larger

What twenty-one years prove

The file records the outcome in its own words: they look great 21 years later. On the certification scale that is Platinum, which covers twenty years and over. As of 2026 the work is twenty-eight years old, and the 2019 certification is the most recent record on it.

The signed file

Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 218, transcribed beside the scan so it can be read on a phone and by a search engine.

Scan of the case study form for case 218, filled in and signed View the signed form full size
Project name
Macomb Community College (1998)
Level
Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
Hired by
The brick manufacturer
Reason for project
Complaint or problem
Issue
"The color of their 8 by 8 brick were too light."
What was corrected
"We darkened the brick to the desired shade."
Storyline
"We lightened the 8 by 8 brick on the enterance and they look great 21 years later."
Authorized
Donald A. Foster, signed, dated 2019

Your Project, Documented for Decades

Every job we stain enters the same discipline: photographed, revisited, re-photographed.

Request a Quote
Call Us Request a Quote