Matching One Floor of Off Run Brick on a Pittsburgh College
One floor of this college building went up in a run of brick that did not match the rest. The company that made the brick paid to have that floor corrected rather than replaced. It was photographed again seven years later and certified then.
2013, mid-job
What was wrong
One floor went up in brick that did not match the floors under it. Nothing had failed and nothing was dirty. The file puts it in one line: the 7th floor of the building was built with an off run of brick.
It was hired by the brick manufacturer, not the college and not the mason. A brick company decided one bad run on a building it had supplied was its own problem, and paid for staining over tear-out.
What was done
Mineral stain, brushed on by hand, unit by unit, and only on the floor that was off. The correction ran both ways: lighten and darken a majority of the brick, until that floor sat in the range of the floors around it. The file dates the project 2012, and both mid-job frames are stamped April 2013, so the work was still running that spring.
2019, seven years on
-
After, 2019
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
-
7 Years After
View this photo larger
What seven years prove
Same building, same floor, and a run that still sits in the range it was brought into. On the certification scale that is Bronze, which covers seven to nine years. As of 2026 the work is fourteen years old.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 164, transcribed beside the scan so it reads on a phone and in a search engine.
View the signed form full size
- Project name
- College in Pittsburgh (2012)
- Level
- Bronze. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Issue
- "The 7th floor of the building was built with an off run of brick."
- What was corrected
- "We had to lighten and darken a majority of the brick."
- Storyline
- "The 7th floor had an off run of brick that did not match the other floors. We only stained the 7th floor, and it still looks great today."
- Authorized
- Donald A. Foster, signed, dated 2019