Clark Center in 2019, the brick reading red across the window bands that were once white

Changing White Brick Bands to Red at Clark Center

The white brick bands on this three-story retirement home were changed to red. Nothing had failed and nothing was dirty; the color was a decision, and the business that runs the building paid for it. It was photographed again twenty-four years later and certified then.

Case No. 026
Structure Retirement home
Location Not released
Stained 1995
Re-photographed July 2019
Elapsed 24 years, Platinum level

1995

  1. A three-story building in red brick with two continuous bands of white brick carrying the upper windows, on bare ground before landscaping Before, 1995 View this photo larger
  2. One window band caught part way through the work: white brick to the right of the windows, a course of pale tan below it, and red brick to the left, with an extension ladder on a van roof rack across the foot of the frame During, 1995 View this photo larger

What was wrong

Nothing. The reason on the file is a color change, and the issue line is one sentence: they wanted to change the white brick to red. A business hired it, not a brick manufacturer and not a mason.

That makes it the harder job. The file names the brick as hard fired, low absorption, one hundred percent clay, in white and buff. Brick that dense takes stain least willingly, and there was no red already in the wall to work toward.

What was done

Mineral stain, brushed on by hand, unit by unit, red onto white. The file is candid about the method: a change this drastic put color theory out of reach, so the color had to be built up in passes rather than shifted a step. The client asked how long it would last. The second set of photographs is the answer.

2019, twenty-four years on

  1. The gabled end of the building in 2019, red brick from the ground to the pediment, with the two window bands reading a lighter red than the courses around them 2019 View this photo larger
  2. A side entrance under a shingled hood in 2019, with the pediment and its carved sunburst above and red brick on every course 2019 View this photo larger
  3. A long run of the building in 2019 seen from the drive, a brick chimney at the far end and shrub planting along the wall, the frame carrying the Brickman Certified stamp After, 2019 View this photo larger
  4. The three-story elevation running away down the service drive in 2019, red brick with the window bands a lighter red the whole length of the wall 24 Years After View this photo larger

What twenty-four years prove

Same walls, still red. In the 2019 frames the two window bands read a shade lighter than the courses around them, which is what built color on white brick looks like beside brick that came out of the kiln red. On the certification scale that is Platinum, the top band, which covers twenty years and over. As of 2026 the work is thirty-one years old, and the 2019 certification is the most recent record on it.

The signed file

Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 026, transcribed beside the scan so it can be read on a phone and by a search engine.

Scan of the case study form for case 026, filled in and signed View the signed form full size
Project name
Clark Center (1995)
Level
Platinum, the top band. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
Hired by
A business or corporation
Reason for project
Color change
Issue
"They wanted to change the white brick to red."
What was corrected
"Makeover"
Storyline
"What a job this was and still is! Changing hard fired, low absorbtion, 100% clay white/buff brick to red. Unfortunatley, because of the drastic makeover and the brick on the house, we could not use "color theory". We had to use "paint-like" thinking. MCI still had the right product and process for this color change, even though we had to "build color". They asked us how long this color change would last. Because of the brick being used, we could see the product "wearing out" but it will never fail like a paint can/will. When we checked up on this project in July of 2019, it still looks great!"
Address
"Permission needed to release address"
Authorized
Donald A. Foster, signed, dated 07/20/2019

Your Project, Documented for Decades

Every job we stain enters the same discipline: photographed, revisited, re-photographed.

Request a Quote