Changing White Brick Bands to Red at Clark Center
The white brick bands on this three-story retirement home were changed to red. Nothing had failed and nothing was dirty; the color was a decision, and the business that runs the building paid for it. It was photographed again twenty-four years later and certified then.
1995
What was wrong
Nothing. The reason on the file is a color change, and the issue line is one sentence: they wanted to change the white brick to red. A business hired it, not a brick manufacturer and not a mason.
That makes it the harder job. The file names the brick as hard fired, low absorption, one hundred percent clay, in white and buff. Brick that dense takes stain least willingly, and there was no red already in the wall to work toward.
What was done
Mineral stain, brushed on by hand, unit by unit, red onto white. The file is candid about the method: a change this drastic put color theory out of reach, so the color had to be built up in passes rather than shifted a step. The client asked how long it would last. The second set of photographs is the answer.
2019, twenty-four years on
-
2019
View this photo larger
-
2019
View this photo larger
-
After, 2019
View this photo larger
-
24 Years After
View this photo larger
What twenty-four years prove
Same walls, still red. In the 2019 frames the two window bands read a shade lighter than the courses around them, which is what built color on white brick looks like beside brick that came out of the kiln red. On the certification scale that is Platinum, the top band, which covers twenty years and over. As of 2026 the work is thirty-one years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 026, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Clark Center (1995)
- Level
- Platinum, the top band. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- A business or corporation
- Reason for project
- Color change
- Issue
- "They wanted to change the white brick to red."
- What was corrected
- "Makeover"
- Storyline
- "What a job this was and still is! Changing hard fired, low absorbtion, 100% clay white/buff brick to red. Unfortunatley, because of the drastic makeover and the brick on the house, we could not use "color theory". We had to use "paint-like" thinking. MCI still had the right product and process for this color change, even though we had to "build color". They asked us how long this color change would last. Because of the brick being used, we could see the product "wearing out" but it will never fail like a paint can/will. When we checked up on this project in July of 2019, it still looks great!"
- Address
- "Permission needed to release address"
- Authorized
- Donald A. Foster, signed, dated 07/20/2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


