Matching an Expansion to the Existing Lawton High School
An expansion went up against this school in brick that did not match the wall it was joined to. The school paid for the staining itself, and every one of the new units was color enhanced into the existing range. It was photographed again fifteen years later and certified then.
2004
What was wrong
An expansion was built onto the school and its brick did not match the brick already standing. The file puts it in eight words: school expansion matching new brick to existing brick. Nothing had failed and nothing was dirty. The two ranges did not agree.
The school hired it directly, not the mason and not the brick supplier. The file is blunt about the sequence, and it is the useful part for anyone specifying an addition: the staining was an afterthought rather than something written into the job.
What was done
Mineral stain, brushed on by hand, unit by unit. The scope in the file is 100 percent of the utility brick: every new unit was color enhanced into the range of the wall it was joined to, rather than a few spots corrected. The approved test panel is on the upper part of the wall above the entrance, and the file says you can still see it there.
2019, fifteen years on
-
2019
View this photo larger
-
2019
View this photo larger
-
After, 2019
View this photo larger
-
15 Years After
View this photo larger
What fifteen years prove
Same school, photographed again in 2019 and signed off that year. On the certification scale that is Gold, which covers fifteen years and over. As of 2026 the work is twenty-two years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 031, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Lawton High School (2004)
- Level
- Gold. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The school
- Reason for project
- Addition or makeover
- Issue
- "School expansion matching new brick to existing brick."
- What was corrected
- "100% of the utility brick needed color enhanced."
- Storyline
- "You can see the approved test panel on the upper part of the wall above the entrance. The school hired MCI directly. We were an after thought. The school wanted a better match, it looks great in 2019!"
- Authorized
- Donald A. Foster, signed, dated 07/01/2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


