The infill panel beside a downspout on the elementary school in 2020, its red and dark brick reading as one range with the original wall on either side

Matching Infill Brick and Blending an Indiana School Addition

Two fill-in areas on the original school had to match the old wall, and a new addition had to stay visibly new but with its dark brick blended evenly. The school hired both parts in 2010. The fill-in was photographed again ten years later and certified then.

Case No. 329
Structure Elementary school
Location Indiana
Stained April 2010
Re-photographed 2020
Elapsed 10 years, Silver level

2010

  1. A fill-in panel of pale pink brick between a curved bay window and a copper downspout in April 2010, lighter than the red and dark brick of the original school on either side, with bare soil at the foundation Before, 2010 View this photo larger
  2. The same fill-in panel in April 2010 with its upper courses already darkened toward the original brick, and orange tape marking the lower courses still to be done During, 2010 View this photo larger

What was wrong

The file records two jobs on one school. Part one: two fill-in areas on the original building, laid in brick that read pink beside the old red and dark range. Part two: a new addition whose dark brick, in the file's words, wasn't blended very well. The school hired both.

What was done

On the fill-ins the brick was stained to closely match the original. The addition was the opposite brief. For historical reasons the school wanted the new building to read as new, down to a different brick texture, so the file is explicit: hired not to make the new match the old, but to even out the blend. Groups and lines of dark brick were taken out, and darks were added where there were none. The photographs on this page are the fill-in.

2020, ten years on

  1. The fill-in panel between the bay window and the downspout in 2020, its brick carrying the same red and dark units as the original wall around it, with the certification stamp in the corner After, 2020 View this photo larger

What ten years prove

Same panel, same downspout, and the seam between old brick and fill-in has to be looked for. On the certification scale that is Silver, which covers ten years and over. As of 2026 the work is sixteen years old, and the 2020 certification is the most recent record on it.

The signed file

Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 329, transcribed beside the scan so it can be read on a phone and by a search engine.

Scan of the case study form for case 329, filled in and signed View the signed form full size
Project name
Elementary School in Indiana
Level
Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
Hired by
The school or university
Reason for project
Addition or makeover
Issue
"This job was two parts: part one was fixing two fill-in areas on the original school, and part two was that the dark brick wasn't blended very well."
What was corrected
"For part one the brick was stained to closely match the original, and for part two we took out groups & lines of dark brick, and added darks to where there were none."
Storyline
"For part one, the infill needed to be a close match to the original building, and for part two, which was a new addition, the newer construction needed to not match the older building: for historical reasons, the school wanted to show the difference between the old and new buildings. They even used a different texture of brick for the new building to help show the new addition was added: we were hired not to make the new match the old, but to even out the blend of bricks in the new addition."
Authorized
Donald A. Foster, signed, dated 2020