The back wall of the house in 2019, the brick running as one range of tan, cream and red under the eaves

Correcting Patchy Brick on the Back of a Tipp City House

The brick on the back of this house went up with patchy areas that did not match the range around them. The company that made the brick paid to have it corrected in 1998. It was photographed again twenty-one years later and certified then.

Case No. 188
Structure Two-story brick home
Location Tipp City, Ohio
Stained 1998
Re-photographed 2019
Elapsed 21 years, Platinum level

1998

  1. The back of the house in 1998, the brick reading as a flat buff tan with pale units scattered across the wall, the chimney and the patio wall below Before, 1998 View this photo larger
  2. The rear corner and the full height of the chimney during the 1998 work, the chimney and the wall beside it warmer and pinker than the wall to the left During, 1998 View this photo larger

What was wrong

The file puts it in one line: there were patchy areas of brick within the range. Nothing had failed and nothing was dirty; some units simply went up off color against the ones beside them. The Hired by line reads brick manufacturer, so the company that made the brick paid to put it right.

What was done

Mineral stain, brushed into the brick by hand, unit by unit, and not all in one direction: the file says the off-colored brick was lightened and darkened. The storyline names the back of the house, where the base color was lightened and white added to bring it into the range.

2019, twenty-one years on

  1. The back of the house in 2019, the rear wall and the corner beyond it reading as one range of tan, cream and red brick, with the certification stamp at the corner of the frame 21 Years After View this photo larger

What twenty-one years prove

The mark on the file is Platinum, which covers twenty years and over on the certification scale. Twenty-one years on, the back wall still reads as a range of brick rather than as one flat tone. As of 2026 the work is twenty-eight years old, and the 2019 certification is the most recent record on it.

The signed file

Every certified job gets the same form, signed on the day someone goes back to the house. This is the one for case 188, transcribed beside the scan so it can be read on a phone and by a search engine.

The case study form for case 188, filled in and signed View the signed form full size
Project name
Rosecrest Tipp City (1998)
Level
Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
Hired by
Brick manufacturer
Reason for project
Complaint or problem
Issues
"There were patchy areas of brick within the range."
What was corrected
"We lightened and darkend the off-colored brick."
Storyline
"There were many areas, especially near the back of the house, where we needed to lighten the base color of the brick then add white to match the rest of the range."
Authorized
Donald A. Foster, signed, dated 2019

Your Project, Documented for Decades

Every job we stain enters the same discipline: photographed, revisited, re-photographed.

Request a Quote
Call Us Request a Quote