Blending Miscolored Brick on a Sterling Heights House
Miscolored brick ran through this house while it was still being built. The company that made the brick paid to have it corrected rather than have the wall torn out. It was photographed again fourteen years later and certified then.
2007
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
What was wrong
The brick went up off range. The file records miscolored brick throughout the house, and the 2007 frames show why it was caught early: the windows are still open holes and the eaves are bare framing. The company that made the brick hired the correction, not the owner.
What was done
Mineral stain, brushed into the brick by hand. The file describes the work as staining for a better blend and flow to the house, and is specific about the method: some brick were lightened and others darkened, rather than every unit being carried to one flat color.
2021, fourteen years on
-
2021
View this photo larger
-
After, 2021
View this photo larger
-
After, 2021
View this photo larger
-
14 Years After
View this photo larger
-
After, 2021
View this photo larger
-
After, 2021
View this photo larger
-
After, 2021
View this photo larger
What fourteen years prove
Same bay, same arch, same garage opening. The close-ups are the test: the stain is in the brick, and the texture and the tooling marks still read through it. On the certification scale fourteen years is Silver, which covers ten years and over. As of 2026 the work is nineteen years old, and the 2021 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 384, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Residence, Sterling Heights, MI (2007)
- Level
- Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Background
- "There were miscolored brick throughout the house"
- Actions taken
- "We stained the brick for a better blend and flow to the house"
- Detail of events
- "14 years later and it still looks great!"
- Address
- "Release permission required"
- Authorized
- Donald A. Foster, signed, dated 2020