Blending Fill-In Brick Into an Ohio Youth Center Wall
A panel of fill-in brick on the front wall of this youth center did not match the wall around it. The mason hired the color correction rather than rebuild, and the wall was photographed again seventeen years later.
2002
What was wrong
A block of fill-in brick sat mid wall, darker and redder than the buff brick around it. Nothing had failed. From the walk it read as a patch, and the file puts it in one line: the fill-ins did not match the rest of the building.
What was done
The darker brick was colored to carry it toward the wall around it. The brief was narrow and the file says so: less visible, not a perfect match. That is a smaller job than a full color change.
2019, seventeen years on
What seventeen years prove
Same wall, same bench, same stretch of walk, and the panel no longer picks itself out of the courses. The form records Platinum, and the file closes on the plainest claim it could make: it still looks as good as the day we left.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 354, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Youth Center, Ohio (2002)
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The mason or contractor
- Reason for project
- Other
- Issue
- "The fill-ins didn't match the rest of the building"
- What was corrected
- "We colored the darker brick for a better match"
- Storyline
- "We were only hired to make it less visible, and not a perfect match. It still looks as good as the day we left!"
- Authorized
- Donald A. Foster, signed, dated 2020