Staining a Rejected Run of Brick on a Northville Home
Two runs of brick went up on this new house and the brickwork was rejected. The company that made the brick paid to bring the off colored run into the field, not the family who had just bought the house. It was photographed again fourteen years later and certified then.
2007
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
Before, 2007
View this photo larger
-
During, 2007
View this photo larger
-
After, 2007
View this photo larger
-
After, 2007
View this photo larger
-
After, 2007
View this photo larger
What was wrong
Two runs of brick arrived for one house and they did not match. The file records the brickwork as rejected. Nothing had failed. The homeowners were not thrilled with the look of their new house, and the company that made the brick hired the correction rather than the family.
What was done
Mineral stain, brushed on by hand, unit by unit. The file gives it one line: the off colored run was stained to match. Each brick is stained individually using a custom blend, so the texture and the appearance stay what the unstained brick already was.
2021, fourteen years on
-
2021
View this photo larger
-
After, 2021
View this photo larger
-
14 Years After
View this photo larger
-
After, 2021
View this photo larger
-
2021
View this photo larger
What fourteen years prove
Same gable, same side wall, one range across the field. The file records no cracking, blistering, peeling or fading after fourteen years. On the certification scale that is Silver, which covers ten years and over. As of 2026 the work is nineteen years old.
The signed file
Every certified job gets the same form, signed when someone goes back to the building. This is the one for case 376, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Residence, Northville, MI (2007)
- Level
- Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Issue
- "Two runs of brick were on the house, and the brickwork was rejected."
- What was corrected
- "We stained the off-colored run to match."
- Storyline
- "The homeowners weren't thrilled with the look of their new house, so we were hired to color correct it. 14 years later and it still looks great!"
- Address
- Withheld. The form records it as release permission required.
- Authorized
- Donald A. Foster, signed, dated 2020