Matching Repaired Brick on a Livonia University Building
Areas of this campus building had been repaired, and the repaired brick did not match the range around it. The trade that did the work paid to bring the off color units back into that range. It was photographed again twelve years later and certified then.
2007
What was wrong
The file puts it in one line: the areas that were repaired were not a good match for the rest of the range. Nothing had failed and nothing was dirty. Replacement brick sat in finished walls reading as patches against everything around it.
The Hired by line reads mason or contractor, so the trade that carried out the repair paid to settle the color rather than leaving it with the campus.
What was done
Mineral stain, brushed into the brick by hand, unit by unit. The correction line reads: we stained all of the off-colored brick. Not one tone across the elevation. The off color units were brought into the range of the brick around them, which is why the finished wall still reads as a range.
2019, twelve years on
What twelve years prove
Twelve years on, the walls read as one range of brick rather than as a wall with patches in it. On the certification scale that is Silver, which covers ten years and over. As of 2026 the work is nineteen years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 230, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- University in Livonia (2007)
- Level
- Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- Mason or contractor
- Reason for project
- Other. The three named boxes on the sheet, complaint or problem, color change, and addition or makeover, are all left blank and the X is against Other.
- Issue
- "The areas that were repaired were not a good match for the rest of the range."
- What was corrected
- "We stained all of the off-colored brick."
- Storyline
- "We were able to stain all of the off-colored brick to match the rest of the range and create a nice match for the range of brick."
- Authorized
- Donald A. Foster, signed, dated 2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


