Blending Restoration Corners on an Illinois University
A restoration left a few corners of this university building in brick that did not match the walls around it. The mason on the job hired the correction in 2008. The corners were photographed again eleven years later and certified then.
2008
What was wrong
Part of the building had been restored, and the new brick on a few corners did not match the walls around it. The file is plain about the expectation: the university knew the brick was not going to be a perfect match but thought it would be close enough. Once it was up, they wanted a closer match. The mason on the job hired the correction, on a limited budget and in a small allotment of time.
What was done
Mineral stain, brushed on brick by brick, to bring the corner units into the range of the surrounding wall. The booklet records one more step: more dark brick was added sporadically for a better looking blend, because the original wall carries dark units scattered through every course and a corner without them would still read as a patch.
2019, eleven years on
-
After, 2019
View this photo larger
-
After, 2019
View this photo larger
-
11 Years After
View this photo larger
What eleven years prove
In 2019 the corners were photographed again. The file records no fading, blistering, cracking or peeling over ten years later. On the certification scale that is Silver, ten years and over. As of 2026 the work is eighteen years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed once someone has gone back to the building. This is the one for case 044, transcribed beside the form page so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- University in Illinois (2008)
- Level
- Silver. The scale runs Bronze at seven years and over, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The mason or contractor
- Cause
- Restoration
- Background
- "Restoration project on a few corners of this university building."
- Actions taken
- "Stained the brick to closely match the surrounding brick."
- Detail of events
- "The university knew that the brick wasn't going to be a perfect match but thought it would be close enough. Once it was up, they decided they wanted a closer match, so we were called in. With a limited budget, they asked for minor changes in a small allotment of time."
- Authorized
- Donald A. Foster, signed, dated 2020. Address: release permission required.
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


