Color Enhancing New Brick to Match Holy Trinity Church
An addition to this church went up in brick that did not match the older building it joined. Every new brick was color enhanced to bring it to the original, and a percentage of them went through a second time. It was photographed again twenty-one years later and certified then.
1998
What was wrong
The addition was finished and its brick did not agree with the building it joined. Nothing had failed and nothing was dirty. The file puts it in eight words: the new brick did not match the existing brick.
What was done
Mineral stain, brushed on by hand, unit by unit, on the new work only. The file records that all the new brick were color enhanced to closely match the older original building, and that all the brick were stained once with a percentage of them stained a second time. The older elevation was left as it was. The addition was brought to it.
2019, twenty-one years on
-
2019
View this photo larger
-
21 Years After
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
What twenty-one years prove
Where the 1998 frames show two brick colors meeting at a joint, the 2019 frames show one wall. On the certification scale that is Platinum, which covers twenty years and over. The note on the form is shorter: the church still looks great in 2019. As of 2026 the work is twenty-eight years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 027, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Holy Trinity (1998)
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- Other. The form's six named categories, from school or university to homeowner, are all unmarked.
- Reason for project
- Addition or makeover
- Issue
- "The new brick did not match the existing brick."
- What was corrected
- "All the new brick were color enhanced to closely match the older original building."
- Storyline
- "All the brick were stained once, and a percentage of the brick were stained a second time. The church still looks great in 2019!"
- Authorized
- Donald A. Foster, signed, dated 2019