Color Enhancing Addition Brick on a Grand Rapids Grocery
The brick for an addition arrived as close as the dealer could get it and still did not match the store it was going onto. The business paid to have the new units stained to the old wall rather than pulled off. It was photographed again twenty-two years later and certified then.
1997 and 1998
What was wrong
The store put on an addition and the addition had to be brick. The file records what happened next in one line: the dealer found the closest brick he could in size, texture and color, and it just wasn't close enough.
The business paid for the correction itself. Not the dealer who supplied the brick, and not the mason who laid it.
What was done
Mineral stain, brushed on by hand, unit by unit, on the new brick only. The phrase in the file is that the brick was color enhanced for a closer match, which is the new work brought to the old wall rather than one color run over both.
2019, twenty-two years on
-
2019
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
-
22 Years After
View this photo larger
What twenty-two years prove
One range of red across the corner, the side wall and the front. On the certification scale that is Platinum, which covers twenty years and over. The file adds a detail that matters more than the level: two more additions have gone on since, so the match had to hold while the building kept changing around it. As of 2026 the work is twenty-nine years old.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 036, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Forrest Hills (1997). Spelled with two r's on the form; the store's own sign in the 1998 photograph reads Forest Hills Foods.
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- Business or corporation
- Reason for project
- Addition or makeover
- Issue
- "Dealer found the closest brick he could in size, texture, and color. It just wasn't close enough."
- What was corrected
- "We color enhanced the brick for a closer match."
- Storyline
- "Stained additions to closely match original brick. Still looks great today. (They have put on two more additions over the years.)"
- Address
- "Permission needed to release address"
- Authorized
- Donald A. Foster, signed, dated 07/01/2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


