Correcting Two Areas of Poor Match at Auburn City Hall
Two areas of brick on this city hall did not match the wall around them. They were stained in 1999 to come closer to the brick they sat in. The building was photographed again twenty years later and certified then.
1999
What was wrong
Two areas of brick on the building were not the color of the wall they sat in. The file records the issue in two words: poor match.
The 1999 frames show what that meant at unit scale. A pier of pale cream brick stands in a wall of rose and brown, and an applicator is working it over by hand.
What was done
Mineral stain, brushed on unit by unit. Nothing was torn out and nothing was covered over. The correction in the file: "We stained the brick to closely compliment the surrounding areas."
2019, twenty years on
-
2019
View this photo larger
-
20 Years After
View this photo larger
-
2019
View this photo larger
-
After, 2019
View this photo larger
-
2019
View this photo larger
What twenty years prove
The wall reads as one range of brick at street distance and at unit scale. On the certification scale that is Platinum, which covers twenty years and over. As of 2026 the work is twenty-seven years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 072, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Auburn City Hall (1999)
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- Other. The eight boxes on the form read school or university, mason or contractor, brick manufacturer, homeowner, architect, brick distributor, business or corporation, and other. The mark is against the last.
- Reason for project
- Other. The four boxes on the form read complaint or problem, addition or makeover, color change, and other. The mark is against the last, so this case study carries no project type in the library filters.
- Issue
- "Poor match"
- What was corrected
- "We stained the brick to closely compliment the surrounding areas."
- Storyline
- "Major color changes in two areas on the building. It still looks great 20 years later!"
- Authorized
- Donald A. Foster, signed, dated 2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


