Darkening Light Brick and Shapes on a South Bend School
Some of the brick on this school came in lighter than the rest, and the special shapes did not match the range either. The company that made the brick paid to have it corrected. It was photographed again twenty years later and certified then.
1999
What was wrong
Nothing had failed and nothing was dirty. Some units had come in lighter than the rest of the delivery, and the special shapes did not sit in the range either. The file records light brick and shapes that did not match the rest of the range.
The brick manufacturer hired the correction, not the school and not the mason. The company that made the brick treated the color of a finished building as its own problem and paid for staining over tear-out.
What was done
Mineral stain, brushed on by hand, unit by unit. The light brick was darkened slightly and every shape was stained to bring it into the range, rather than one color laid over the whole wall. The brick was very hard fired with low absorption, so it took more applications than usual to reach the look the customer wanted.
2019, twenty years on
-
2019
View this photo larger
-
20 Years After
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
What twenty years prove
Same wall, same accent course, and a cream field that still reads as one range. On the certification scale twenty years and over is Platinum, and this file sits exactly on that mark. As of 2026 the work is twenty-seven years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 298, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- South Bend School (1999)
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Issue
- "There were some light brick and shapes that did not match the rest of the range."
- What was corrected
- "We slightly darkened the light brick and stained all of the shapes to better match the range."
- Storyline
- "This was a very hard fired clay brick with low absorption. We were able to tint the brick and we were successful but because of the low absorption it took more applications to achieve the look the customer wanted."
- Authorized
- Donald A. Foster, signed, dated 2019