Darkening Light Brick on a Romeo Michigan Home
The brick on this two-story house went up with too many light units in the wall. The company that made the brick paid to have them darkened, and the whole job took one day. It was photographed again twenty-three years later and certified then.
1996
What was wrong
Nothing had failed and nothing was dirty. The brick was new and the range simply ran too pale in places, which on a front elevation is what you see from the road. The file records the issue as too many light brick in the wall.
It was hired by the brick manufacturer, not the homeowner. The company that supplied the brick paid for staining rather than tear-out.
What was done
Mineral stain, brushed on by hand and only onto the units that needed it. The correction on the form is one sentence: we darkened the light brick to create a better range. Two walls were treated, the front and the side where the gas and electric meters sit, and the crew was there a single day.
2019, twenty-three years on
-
2019
View this photo larger
-
After, 2019
View this photo larger
-
23 Years After
View this photo larger
-
2019
View this photo larger
What twenty-three years prove
Same wing, same octagonal window, same range. On the certification scale that is Platinum, which covers twenty years and over, and it is the top of the scale. As of 2026 the work is thirty years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 095, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Romeo, MI Residence (1996)
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- Brick manufacturer
- Reason for project
- Complaint or problem
- Issues
- "There were too many light brick in the wall."
- What was corrected
- "We darkened the light brick to create a better range."
- Storyline
- "This project only took us one day to complete. We had to blend the front wall and side wall (where the gas and electric) meters were."
- Address
- "Permission needed to release address"
- Authorized
- Donald A. Foster, signed, dated 2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote


