Darkening Grouped White Brick on a Novi Hospital
The brick on this hospital went up with too many white units grouped together. The company that made the brick paid to have them darkened back into the range around them. It was photographed again twenty-one years later and certified then.
1998
What was wrong
Nothing had failed and nothing was dirty. The white units in the range had come out of the kiln fine and gone up in clusters, so the wall read in patches instead of one blend. The file records it in one line: there were too many white brick in groups.
The brick manufacturer hired the work, not the hospital and not the mason. The company that supplied the brick treated the color of a finished building as its own account and paid to correct it.
What was done
Mineral stain, brushed in by hand, unit by unit, on the brick that sat outside the range. The correction ran one direction: the white units were darkened until they agreed with the brick around them. The phrase in the file is a more cohesive appearance to the building.
2019, twenty-one years on
-
2019
View this photo larger
-
21 Years After
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
What twenty-one years prove
Same building, same courtyard, and a wall that still holds one range across both floors. On the certification scale that is Platinum, which covers twenty years and over. As of 2026 the work is twenty-eight years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 173, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Novi Hospital (1998)
- Level
- Platinum. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Issue
- "There were too many white brick in groups."
- What was corrected
- "We darkened some of the white brick throughout the building."
- Storyline
- "The amount of white brick in the range was unnacceptable, so we stained most of the white brick to a darker color to give a more coheasive appearance to the building."
- Address
- Left blank, printed "Permission needed to release address."
- Authorized
- Donald A. Foster, signed, dated 2019