Repairing Power Wash Damage at a Michigan Home Depot
The brick on this store was damaged by powerwashing while the building was still going up. It was color corrected in 2000, photographed again nineteen years later, and certified then.
2000
What was wrong
The file records the issue in seven words: there was powerwash damage on the building. Both 2000 frames carry a burned-in camera date, 6 7 '00 and 6 8 '00, and both show the store still under construction, with graded dirt at the wall.
It was not hired by the owner, the mason or the brick company. The Hired by box on the form is marked Other.
What was done
Mineral stain, brushed on by hand, and only where the damage was. The file says the affected areas were color corrected, and the storyline calls the result color enhanced to look good and natural again.
2019, nineteen years on
-
2019
View this photo larger
-
19 Years After
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
What nineteen years prove
Same building, and a wall that reads as one brick at distance and at unit scale. On the certification scale that is Gold, which covers fifteen years and over. As of 2026 the work is twenty-six years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 275, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- MI Home Depot (2000)
- Level
- Gold. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- Other
- Reason for project
- Complaint or problem
- Issue
- "There was powerwash damage on the building."
- What was corrected
- "We color corrected all of the affected areas."
- Storyline
- "The building had extensive damage, but with our Proven Masonry Stain we color enhanced it to look good and natural again."
- Address
- "Permission needed to release address"
- Authorized
- Donald A. Foster, signed, dated 2019