Breaking Up Flat Brick Runs at Lincoln School in Ohio
The architect rejected the brick on this Ohio school after it was laid, because large groups of units had come out the same color. The company that made the brick paid for two days of staining to break the runs up and even out the range. It was photographed again nineteen years later and certified then.
2000
What was wrong
The brick went up and the architect turned it down. Nothing had failed and nothing was dirty. The file records the issue in five words: the architect rejected the brick. Large groups of units had fired to the same color, so long stretches read flat instead of as a range.
It was hired by the brick manufacturer, not the school and not the mason. A brick company decided the color of a building it had supplied was its own problem, and paid for staining over tear-out.
What was done
Two days on site. Mineral stain brushed on by hand, unit by unit, some units lightened and others darkened so the matched runs broke up. Not one color over the wall: the phrase in the file is an even blend to the range.
2019, nineteen years on
-
2019
View this photo larger
-
2019
View this photo larger
-
19 Years After
View this photo larger
-
2019
View this photo larger
What nineteen years prove
Same building, and the range is still a range. On the certification scale nineteen years is Gold, which covers fifteen and over. As of 2026 the work is twenty-six years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 250, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- OH School (2000)
- Level
- Gold. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Issue
- "The architect rejected the brick."
- What was corrected
- "We had to lighten and darken the brick."
- Storyline
- "The architect was not pleased with how the brick looked after being installed. We were hired for two days to break up large groups of brick that were all the same color and add an even blend to the range."
- Authorized
- Donald A. Foster, signed, dated 2019