Matching New Brick to Old on a Kingsford Heights School
The school added a wing and the brick it already had did not match the brick the wing went up in. Both sides were stained to meet in the middle. It was photographed again and certified fourteen years later.
2005
What was wrong
The school built an addition and the brick did not agree with the brick already standing. The file puts it in fourteen words: they added an addition to the school, but the brick they currently had did not match.
The school hired it directly, not the mason and not the brick company. The building's own owner paid to have the two elevations read as one.
What was done
Mineral stain, brushed on by hand, on both sides of the joint. Parts of the existing building were stained to match the new addition, and parts of the new addition were stained to match the existing building. The file records a second brief on the same job: the color was chosen to complement the school's athletic programs.
2019, fourteen years on
-
2019
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
-
14 Years After
View this photo larger
What fourteen years prove
Same school, photographed again in 2019 and signed off that year. On the certification scale that is Silver, which covers ten years and over. As of 2026 the work is twenty-one years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 017, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- School in Indiana (2005)
- Level
- Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The school or university
- Reason for project
- Addition or makeover
- Issue
- "They added an addition to the school, but the brick they currently had did not match."
- What was corrected
- "We stained brick on the existing building as well as the addition to create a better match and to compliment the schools athletic programs."
- Storyline
- "Great example of how flexible we can be! We stained parts of the existing building to match the new addition and parts of the new addition to match the existing building. This was a very cool project to work on, and still looks great 14 years later!"
- Authorized
- Donald A. Foster, signed, dated 2019