Matching Two Runs of Split Face Block at Granger Family Medical
Two runs of split faced block went up on this medical building in colors that did not match. The mason who built it paid to have the off-colored run stained to the rest. It was photographed again eleven years later and certified then.
2008
What was wrong
Two runs of split faced block went up on the same building and they did not agree with each other. Nothing had failed and nothing was dirty. The file records it in one line: there were two different runs of split faced block installed.
It was hired by the mason or contractor, not the owner. The trade that laid the block carried the cost of putting the color right.
What was done
The off-colored run was stained to the rest, by hand, unit by unit. The file marks this one out as a little different from the jobs we normally do, because the surface taking the stain was split faced block rather than brick.
2019, eleven years on
-
2019
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
-
11 Years After
View this photo larger
What eleven years prove
Same building, same base course, and a run that still sits with the ones beside it. On the certification scale that is Silver, which covers ten years and over. As of 2026 the work is eighteen years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 297, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Granger Family Medical (2008)
- Level
- Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The mason or contractor
- Reason for project
- Complaint or problem
- Issue
- "There were two different runs of split faced block installed."
- What was corrected
- "We stained the off-colored run to match the rest."
- Storyline
- "This project was a little different from the jobs we normally do because here we stained split faced block. There were two different runs of brick were installed so we stained the off-colored brick to match the rest of the brick."
- Authorized
- Donald A. Foster, signed, dated 2019