Lightening Large Areas of Dark Brick on a Dublin Office
Large areas of the brick on this two-story office center fired darker than the range it was specified in. The company that made the brick paid to have ninety percent of it lightened rather than torn out. It was photographed again fourteen years later and certified then.
2005
What was wrong
"There were large areas of dark brick that did not belong in the range." Nothing had failed and nothing was dirty. The units were sound; a share of them had come out of the kiln darker than the range the building was specified in, and at wall scale they read as patches.
It was hired by the brick manufacturer, not the owner and not the mason. A brick company decided the color of a finished building it had supplied was its own problem.
What was done
"We lightened 90% of the brick." Mineral stain, brushed on by hand, unit by unit. Not one color across the elevation: the dark units were brought up into the range of the ones around them, which is why the finished wall still reads as several brick colors rather than as a single flat tone.
2019, fourteen years on
-
14 Years After
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
-
2019
View this photo larger
What fourteen years prove
The file records that this was not one building: "There were multiple buildings that had the same issue with the brick. They were considering having the brick torn down and redone but instead they hired us." Fourteen years on, the same wall still reads as one range. On the certification scale that is Silver, which covers ten years and over. As of 2026 the work is twenty-one years old, and the 2019 certification is the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 294, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Dublin Office Center (2005)
- Level
- Silver. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick manufacturer
- Reason for project
- Complaint or problem
- Issue
- "There were large areas of dark brick that did not belong in the range."
- What was corrected
- "We lightened 90% of the brick."
- Storyline
- "There were multiple buildings that had the same issue with the brick. They were considering having the brick torn down and redone but instead they hired us and we were able to complete it to their satisfaction."
- Authorized
- Donald A. Foster, signed, dated 2019
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote