Lightening a Dark Brick Run on a Beavercreek Store Addition
The store added on to its building and the brick for the addition came from a different run, too dark for the wall it joined. The brick distributor paid to have it corrected. The building was photographed again seventeen years later and certified then.
2002
-
Before, 2002
View this photo larger
-
During, 2002
View this photo larger
-
During, 2002
View this photo larger
What was wrong
The file is plain about it. The brick for the addition came from a different run, it was too dark, and it did not match the wall it joined. Nothing had failed. The brick distributor hired the correction, not the owner.
What was done
Mineral stain, brushed on brick by brick, lightening the whole of the off color run. The booklet records a step the form does not: a reverse test panel, everything stained but a small patch, so the client could see both states on one wall and approve the blend before the rest was carried through.
2019, seventeen years on
-
After, 2019
View this photo larger
-
After, 2019
View this photo larger
-
After, 2019
View this photo larger
-
After, 2019
View this photo larger
-
After, 2019
View this photo larger
What seventeen years prove
One range across the addition and the wall it joined, at arm's length and down the whole elevation. On the certification scale that is Gold, which covers fifteen years and over. As of 2026 the work is twenty four years old, and the 2019 photographs are the most recent record on it.
The signed file
Every certified job gets the same form, signed on the day someone goes back to the building. This is the one for case 198, transcribed beside the scan so it can be read on a phone and by a search engine.
View the signed form full size
- Project name
- Business, Beavercreek, OH (2002)
- Level
- Gold. The scale runs Bronze at seven to nine years, Silver at ten and over, Gold at fifteen and over, Platinum at twenty and over.
- Hired by
- The brick distributor
- Reason for project
- Addition or makeover
- Issue
- "The brick on the end of the store were from a different run and did not match the other brick"
- What was corrected
- "We lightened 100% of the off-colored brick"
- Storyline
- "When the store added on to the building, the run of brick was too dark. 19 years later, it still looks great!"
- Authorized
- Donald A. Foster, signed, dated 2020
Your Project, Documented for Decades
Every job we stain enters the same discipline: photographed, revisited, re-photographed.
Request a Quote

